top of page

HEALTHCARE

​​UCD HSE BETTY MOORE
SCHOOL  OF NURSING

SACRAMENTO, CA

 

Morton and Pitalo, Inc. provided civil engineering services including the preparation of civil improvement plans, drainage calculations, and Storm Water Pollution Prevention Plan (SWPPP), as well as provided construction staking, and construction phase assistance to the Design Build Contractor.

 

This Design Build Team shall design and construct a new approximately 70,000-gross square-foot building for the UC Davis School of Medicine and the Betty Irene Moore School of Nursing at the UC Davis Sacramento Campus. The building will house instructional, administration and support services for students, faculty and staff. It will be designed to foster interdisciplinary and interprofessional education with other campus education facilities, creating a welcoming environment that serves as a magnet for students, faculty, staff and other health-care professionals. It will provide state-of-the-art facilities including new technology to enhance collaborative learning.  

 

The project includes site development and landscaping connecting and showcasing the HSE building. Site development will connect a pedestrian thoroughfare through the overall campus, providing circulation between adjacent educational and research buildings and creating outdoor program space. The project also includes site utility infrastructure serving the new HSE building.

 

Client: UC Davis
Gross Site Area: 70,000 SF

​

​

UC DAVIS MEDICAL CENTER

SACRAMENTO, CA

 

Morton & Pitalo, Inc. has been the engineering firm of choice for projects on the UC Davis Medical Center Campus including: Parking Garage for the main Medical Center Building, Medical Records building, Patient Support Services Building, the three (3) Instruction and Research Zone District (IRZD) Buildings that includes clinical laboratories and classrooms, Ambulatory Care Center and adjacent Parking Structure II, Courtyard by Marriott Hotel, Glassrock Building, General Sherman Building, the Re-alignment and Construction of 2nd Avenue, and Parking Structure III.

Services provided include: • Engineering Improvement Plans • Grading Plan • Drainage System • Sewer System • Water Distribution • Fire Protection System • Specifications • Final Map Approval • Offsite Utilities

​

Client: Various

Site Area: Various

​

REPRESENTATIVE PROJECTS

 

DIGNITY HEALTH STOCKTON

FONG RANCH ROAD CLINIC 

GENERAL SHERMAN MEDICAL BUILDING

KAISER PERMANENTE, ELK GROVE
KAISER PERMANENTE, FOLSOM
KAISER PERMANENTE SACRAMENTO
KAISER PERMANENTE S. SACRAMENTO
MERCY, SAN JOAQUIN
METHODIST HOSPITAL, SACRAMENTO

P.C. MENTAL HEALTH & VOCATIONAL TRAINING 

TURLOCK NORTH VALLEY LABORATORY 

UC DAVIS HSE BETTY MOORE SCHOOL OF NURSING 

UC DAVIS LIFESPAN CENTER
UC DAVIS MEDICAL CENTER 
UCDMC AMBULATORY CARE CENTER
UCDMC CMS REHAB HOSPITAL
UCDMC NORTH ADDITION
UCDMC PARKING II & III

UC DAVIS POLLINATOR HEALTH LAB FACILITY 
UCDMC RESEARCH BUILDING III

bottom of page